We then installed 6,000 feet of 1/2″ hePEX radiant tubing in the Warmboard radiant panel grooves. The tubing snapped in place and then we installed nail plates at one-foot increments to hold the tubing in place. The panels and tubing were then painted with flat black paint to increase the radiant heat transfer across the air gap […]
![](https://blackstormrss.com/wp-content/uploads/2024/02/65c511c585d34d001f88a541-1_nmd_techs_install_uponor_pex_tubing_into_warmboa.png)